Tub | Shower Surround
With favorable conditions, it takes approximately 4 days to install a Tub | Shower Surround. Be sure to keep in mind, actual days may vary.

01
Demo | Frame
Approx. 2 Days
Removing the old cast iron tub, all old tile, concrete base, and concrete backer on walls. Then adding framing members to the new shower.
02
Install Valves | Set Tub
Approx. 1 Day
After test fitting and running plumbing, the new tub is also test fitted and installed. Measurements are then taken for the new surround to be installed.


03
Install Surround
Approx. 1 Days
The surround is test fitted and installed, seams are siliconed, and fixtures are installed.

Tub | Shower Surround Package
All Materials and Labor Included
Tub | Shower Surround
5,000$Classic white fiberglass tub or shower surround.Â- Tub or Shower Surround
- Standard Tub or Shower Base
- New Shower Fixtures
Tub | Shower Surround
7,500$Waterproof paneling screwed to studs or adhered to shower walls with adhesive. 10+ Color Options.Â- Tub or Shower Paneling Resembling Tile
- Standard Tub or Shower Base
- New Shower Fixtures
Approx. 5 Days
Approx. 4 Days