Stand Up Shower
With favorable conditions, it takes approximately 10 days for a Stand Up Shower to be installed with your favorite choice of Tile. Be sure to keep in mind, actual days vary.

01
Demo | Frame
Approx. 2 Days
Removing all the old tile, thresholds, concrete base, and concrete backer on walls. Then adding framing members to the new shower.
02
Install Valves | Set Base | Waterproof
Approx. 2.5 Days
After test fitting and running plumbing, the new shower base is also test fitted and installed. Measurements are then taken for the waterproofing membrane. Following that, it is installed.


03
Tile | Grout
Approx. 4 Days
Tile setting commences, after the tile pattern is approved and agreed upon by contractor and client.
04
Clean | Walk Through
Approx. 1 Days
After all tile and grout has cured, is it cleaned and sealed. Then fixtures are installed.


Stand Up Shower Package
All Materials and Labor Included
Silver
7,500$Waterproof paneling screwed to studs or adhered to shower walls with adhesive | 10+ Color OptionsÂ- Shower Surround Paneling Resembling Tile
- Standard Shower Base
- New Shower Fixtures
Gold
14,500$A Shower Upgrade That Will Stand Out In Your NeighborhoodÂ- Waterproof System
- Tile to Ceiling in Shower Area
- Standard Niche
- New Shower Fixtures
- One Shower Head
- Recessed Lights in Shower
- Best Value
Diamond
20,500$The Shower You've Been Dreaming About With All Your Favorite FeaturesÂ- Waterproof System
- Tile to Ceiling in Shower Area
- Custom Niche
- New Shower Fixtures
- Multiple Shower Heads
- Recessed Lights in Shower w/ Dimmer
- Luxury Tile Patterns
- Accent Wall
- Mitered TIle Edges
- 3D Model Design
- European Shower Doors
Approx. 4 Days
Approx. 11 Days
Approx. 10 Days