top of page
Bathroom [Vinyl | Laminate] Flooring
In a large or small bathroom, waterproofed Vinyl or Laminate Plank Flooring can be installed and walked on in 1 day, in most cases. This may save a nice chunk of money and time during a renovation.
In an instance were we have to rip up the current flooring or subfloor, it could add 1 - 1.5 extra days onto the job.

01
Before Floor
Approx. 0 Days
Current flooring intact with a good bond to the subfloor beneath of it.
02
Install | Clean | Walk Through
Approx. 1 Days
Finished Luxury Vinyl Plank Flooring, installed in 1 day.

bottom of page